Sunday, April 3, 2011

Closer To Moving In...

Hans and I visited our cabin after two weeks away.  We have seen many changes since our last visit and although many of them are small to the eye, they are huge to us, as our home gets closer and closer to completion.

We were thrilled to see interior walls finished with the log siding on the top half and have been "painted" with clear finish.  All the interior doors have arrived and have been painted with the clear finish.

Our greatest treat this trip was that our fireplaces have been finished with the river rock stones.  They turned out beautiful and are just what we had hoped they would be.

Our kitchen and bathroom cupboards have been delivered...sitting in boxes in the basement.  As soon as they put tile in the bathrooms and hardwood in the kitchen, they will be installed.  It has been a long time since we ordered them and we sure hope they turn out like we think they will. Things are beautiful in a 6"x 6" board, but when it comes to the real thing...well, we will wait and see!

We now have stairs on the back porch and from the deck.  It is starting to feel like a real home now rather than a construction zone.

See our updates in our pictures below:

Steps coming off the side porch with gate
to keep the critters off
Steps off back porch.  This door goes directly
into the laundry room/mud room.  Back filled
with dirt to build up the level.  Small box on
the left hand side is now our "well head" 
Interior log walls finished with log siding and
tongue in groove ceiling...all done!
Bedroom fireplace with stone

Living room fireplace with stone.
Bedroom ceiling and log walls finished all the way up!
Kitchen & bathroom cabinets...ready to be installed
Different angle of kitchen & bathroom cabinets.






No comments:

Post a Comment