Saturday, March 26, 2011

Progress, progress and more progress


Today I delivered bathroom mirrors that Sophie and I picked up yesterday. We have ceilings upstairs, doors ready to be installed and the first of three fire places have stone on the surround. Our shower needed some modification. Sophie's bench was about 9 inches too high and is now down to 15". The hard backing is being laid before the tile goes in and the log facing on the inside of the gable ends is going up. Take a look at the photographs showing some of the progress over the last week.

Thanks for watching and following the progress of our project.











Installed railings ready for a fresh coat of stain.









A lot of time will be spent on this porch looking out at the mountains we so love.









Gutter and snow stopper are essential.









Tongue and groove ceilings. The gable will be sided with log siding to finish this look.









Our kitchen will be well lighted.









Doors ready for installation.









The fireplace in our master suite.









A close up of our mantle looking good together with the new surround on the fireplace.


2 comments:

  1. I forgot to ask....is all of your drywall up? one thing we did when remodeling our home was to write inside the drywall: Date of build, WHO we were, etc. Fun thing for someone to find YEARS from now... :D

    ReplyDelete
  2. up and painted by the time you mentioned it. Oh well!

    ReplyDelete